Whitepaper
From Gantt to Flowlines
The Critical Path Method has dominated construction scheduling for decades. It coordinates milestones well, but it does not show how work moves through a building, floor by floor, trade by trade. Two approaches grew out of that gap: the Location-Based Management System and Takt Time Planning.
This paper briefly explains the theoretical foundation of these three methods.